How Much to Charge for a Bathroom Remodel

Jobnix Team·8 min read·

Direct answer: how should contractors price a bathroom remodel?

Direct answer: Contractors should price a bathroom remodel by separating demolition, plumbing, electrical, waterproofing, tile, fixtures, finishes, permits, disposal, contingency and payment milestones. A clear estimate should state the selected fixtures, site assumptions, exclusions and change approval process before the homeowner approves the work.

Bathroom remodels can be valuable residential projects, but they are hard to estimate accurately because fixture choices, hidden damage, access and waterproofing details can change the scope. Here's what US contractors should include before giving a customer a price.

Average bathroom remodel costs

Remodel TypeAverage CostDuration
Basic update (fixtures, paint, hardware)$3,000-$7,0003-5 days
Mid-range remodel$10,000-$25,0002-4 weeks
High-end remodel$25,000-$50,000+4-8 weeks
Walk-in shower conversion$5,000-$15,0001-2 weeks
Full gut and rebuild$15,000-$40,0003-6 weeks

Labor rates by trade

  • General contractor: $50-$100/hour or 15-25% of total project
  • Plumber: $75-$130/hour
  • Electrician: $75-$120/hour
  • Tile installer: $40-$80/hour

What to include in a bathroom remodel estimate

  1. Demo and disposal
  2. Rough plumbing
  3. Electrical - GFCI outlets, fan, lighting
  4. Framing and drywall - moisture-resistant board
  5. Waterproofing
  6. Tile installation
  7. Fixtures - toilet, vanity, faucets, shower/tub
  8. Finishing - paint, trim, mirrors, accessories
  9. Permits

How to protect your profit margin

  • Build in 10-15% contingency for hidden issues
  • Get material selections before estimating
  • Use allowances for undecided items
  • Stage your payments - 30% deposit, 30% at rough-in, 30% at tile, 10% at completion

Create itemized bathroom remodel estimates with fixture allowances, payment stages and customer approval links using Jobnix. For larger projects, pair the estimate with a written payment schedule and use the change order template when hidden work changes the scope.

bathroom remodelpricingplumbingUS contractors

Send quotes that win work

Professional quotes from your phone, with clear line items and customer acceptance. Try Jobnix free for 14 days.